Projects

Live MVPs and prototypes, hardware pilots, and platform solutions.

1. Classifieds / marketplace (milolepo.com) milolepo.com

Marketplace MVP 8 weeks
Stack: PHP (Slim), PostgreSQL, Redis, WebSockets, JavaScript, i18n, Email/SMS, CDN

Launch of a sales channel: catalog, payments, delivery, multilingual; growth in assortment and transactions; outpaced a local competitor by sellers/products, up to 50% of its traffic.

AI search and product/gift matching, auto-translation into 3 languages, built-in chat.

  • AI search
  • product matching
  • multilingual
  • chat

2. Marketplace for goods and services (express.market) express.market

Marketplace MVP 2 weeks (pivot)
Stack: PHP (Slim), PostgreSQL, CSV, XML, FedEx API, Stripe, i18n

Pivot with core transfer: CSV/XML import, FedEx delivery, Stripe payments, multilingual; minimal downtime and a quick return to revenue.

Focus on critical flows: search/listing/checkout/delivery.

  • AI search
  • product matching
  • FedEx
  • Stripe
  • CSV/XML

3. AI LeadGen (SaaS) (b2bforce.pro) b2bforce.pro

SaaS MVP 4 weeks
Stack: Chrome Extension (JavaScript), PHP (Slim), PostgreSQL, Redis, Cron, GA4

Campaign engine and auto-dialogs in LinkedIn, intent detection, anti-spam practices, mini-CRM; more relevant replies and a transparent funnel.

Scenario editor, storage of structured dialogs and metrics.

  • LinkedIn
  • dialog scripts
  • intent detection

4. Photo enhancement (B2C) — MVP · fotолuxo.com fotoluxo.com

B2C / AI-photo MVP 4 days
Stack: HTML, CSS, JavaScript, PHP, Apache, PayPal, Hotmart, OpenAI, GA4, Ubuntu

Smoke MVP: landing+checkout, processing queue, localization; fast demand test and basic unit economics without rewriting the core.

Payments and credit tracking connected, conversion metrics, results stored by deviceId.

  • upscale
  • retouch
  • before/after
  • BR localization

5. Digital twin of a production line

Industry Project 3 weeks
Stack: Python, Streamlit, NumPy, Pandas, SimPy, CSV, Excel

Modeling output/cost: 3 algorithms, bottlenecks, “what-if” scenarios, management dashboards and reports.

Transparency for production and finance, ROI forecast of improvements.

  • bottlenecks
  • ROI
  • max throughput
  • min cost

6. Landing generator — prototype (landos.io) landos.io

B2B Prototype 2 weeks
Stack: PHP (Slim), PostgreSQL, DOM/CSS Parsing, HTML/CSS, Templating

PoC: cloning structure/content/styles and adapting to the brand; faster GTM and offer experiments.

Quick A/B hypotheses based on proven patterns.

  • structure copy
  • style copy
  • brand adaptation

7. Platform for restaurants (HoReCa) (restogrand.com) restogrand.com

B2B MVP 3 weeks
Stack: PHP (Slim), PostgreSQL, WebSockets, JavaScript

Unified system: QR menu, reservations, loyalty, delivery, billing; more self-service and higher LTV, clear statuses.

Stable backend and basic integrations for pilots.

  • QR menu
  • queue
  • loyalty
  • reservation
  • delivery

8. Smart locker

Hardware Pilot 4 weeks (pilot)
Stack: PHP (Laravel), PostgreSQL, Redis, REST API, MQTT, Hardware Integration

MVP pilot: locker integration, core for intake/issuance, payments, monitoring and roles; quick launch of the first locations.

Integrations, alerts, failover scenarios.

  • IoT
  • remote control
  • payments
  • telemetry

9. Vending laundromat

Hardware Release 8 weeks
Stack: Laravel, PostgreSQL, Redis, Vue.js, Flutter, Centrifugo, MQTT, Payments

Online booking/payment, remote control, telemetry; self-service revenue, control of downtime and utilization.

A single low-code processor connects web, mobile, cloud, and devices.

  • online booking
  • payment
  • RFID
  • control

10. Liquid chemical dosing (software + hardware)

Hardware Project 4 months (with equipment development)
Stack: C/C++ (MCU), Sensors, Actuators, Laravel, PostgreSQL, REST, Telemetry

Software + MCU: calibrations, telemetry, event logs, alerts; lower chemical use and less quality variability.

Priority — safety: protection from overflows/failures, logs and notifications.

  • sensors
  • telemetry
  • dose control
  • safety

11. RFID production tracking

Industrial Pilot 6 weeks (pilot)
Stack: Laravel, PostgreSQL, REST, RFID Readers/Tags, Alerts

WIP transparency: tag/point maps, pass-through events, alerts on downtime/bottlenecks.

Reducing hidden delays, control of stages and bottlenecks.

  • WIP
  • tag/point maps
  • downtime

12. Process orchestration (low-code)

Platform Phased Phased
Stack: C#, .NET, Laravel, Queues, Connectors (web/mobile/cloud/equipment), Operator UI

Unifying processes and integrations: queues and connectors (web/mobile/cloud/equipment), operator UI; quick changes without hardcode.

Control of data flows and status visualization.

  • processes
  • integrations
  • operator UI

13. Financial institution — specification of requirements/architecture

Enterprise Project In sprints
Stack: Oracle, Java (microservices)

Reverse engineering, detailed specs and DB/service diagrams, change regulations; faster approvals.

Lower release risks and transparency of changes.

  • requirements
  • architecture
  • decomposition

14. Joingoing (travel service: mobile app and API)

B2C Release ≈ 2 years
Stack: PHP, PostgreSQL, REST API, Cordova, Integrations (Weather.com, HERE, Google, TTS)

Mobile travel service: booking/POI/routes; integrations with external services; 10k+ installs.

Mass content import, a dozen external APIs.

  • routes
  • POI
  • multilingual
  • integrations

15. No/Low-code platform

Platform Phased Phased
Stack: .NET Framework, ASP.NET, C#, MS SQL Server, Ajax, React, Highcharts, Vis.js, OpenXML, COM

Startup founder: 3DL description language, ORM, visualizations and integrations; 10+ deployments by analysts.

From forms and processes to reports and integrations — without programming.

  • DSL
  • visual forms
  • integrations
  • dashboards

16. Insurance — DLRS (direct compensation)

Enterprise Release Phased
Stack: .NET/ASP.NET/C#, MS SQL, Web services

Implementation of direct compensation processes and external integrations; shorter settlement cycle.

Data exchange, settlements, and status control.

  • insurance cases
  • settlements
  • integrations

17. Insurance — contract management

Enterprise Release Phased
Stack: C#, .NET, No/Low-code Platform, MS SQL, Integrations (1C and others)

Unified framework for contracts and claims handling, BSO control and reporting.

Integrations with 1C and specialized services.

  • contracts
  • claims handling
  • BSO

18. Issuing and supporting insurance policies

Enterprise Release Phased
Stack: .NET/ASP.NET/C#, MS SQL, Printing, Integrations

Issuing, calculation, printing, accounting, form control.

Shorter processing time and error control.

  • dealer centers
  • operational processes

19. Sale of usable leftovers (salvage)

Enterprise Release Phased
Stack: C#, .NET, No/Low-code Platform, MS SQL, Publications/Auctions

Monetizing illiquid stock: publications/auctions, statuses and reporting.

Transparency of inventory and realizations.

  • auctions
  • monetizing illiquid stock

20. Claims and litigation

Enterprise Release Phased
Stack: C#, .NET, No/Low-code Platform, MS SQL, Case Management, Reports

Case portfolio management: cards, deadline control, reports.

Fewer manual errors and formalized processes.

  • cases
  • deadlines
  • reports

21. Service Desk (internal)

Internal Release 2 weeks
Stack: C#, .NET, No/Low-code Platform, MS SQL, Web

SLA control and operational transparency: tickets, queues, roles, reporting.

Metrics and templates, workload distribution across the team.

  • SLA
  • queues
  • notifications

22. Corporate data warehouse (DWH) — insurance holding

Enterprise Release ≈ 1 year
Stack: C#, .NET, MS SQL Server 2000, Oracle, Business Objects

DWH with integration of eight different systems and reporting in Business Objects.

Unified methodology for management reporting and robust loading pipelines.

  • ETL
  • DWH
  • integrations (8 systems)
  • budgeting